A project of any complexity is developed individually for each customer. If there is data only about the area and purpose of the object, it is impossible to determine its value. An important role in determining the price of design work is played by the architectural style, technological and constructive complexity, the requirement for the composition of materials and design terms. Therefore, the approximate cost of the project can be determined only after discussing all the details and studying the source documentation.
It is necessary
Collection of prices for design work
Instructions
Step 1
The development of the project is carried out on the basis of a work contract between the customer and the contractor. The cost of work is determined in accordance with the current "Collection of prices for design work". For complex objects, the price is set by agreement of the parties and is determined by labor costs. The base cost takes into account normal design conditions. If an object of special importance is being designed, located on a complex area, then in the calculation of the cost, the prices are applied with an increasing coefficient by prior agreement of the parties.
Step 2
The amount of the contractor's team's salary is determined by the contract, which stipulates both the additional remuneration and the share due to the technicians.
Step 3
To carry out a preliminary assessment of design work, you must use the approved "Book of prices for design work", containing tables taking into account the types of buildings, number of storeys, composition, footage and the approximate ratio of the project price to the development price, depending on the stage of design work. This guide is intended for calculating the base cost, which will subsequently be formed taking into account the contractual conditions.
Step 4
Changes to the project associated with the introduction of new regulatory documents into force, as well as the replacement of equipment with more progressive ones, should be provided for by a separate order from the customer or a new design assignment and paid additionally. But it is impossible to include in the price the correction of mistakes made through the fault of the performer.
Step 5
If the designer needs to develop detailed drawings of metal structures, technological ducts and pipelines, as well as gas ducts, then the prices for these works are set by price lists of manufacturers, or departmental price lists. The cost of measuring work and surveys of objects that are subject to reconstruction, expansion or technical re-equipment is determined by calculating the cost in accordance with the costs, or according to the approved Directory.