To install meters, you need a building license. In a broad sense, it is this document that means obtaining a certain permit for all the necessary types of construction, design and installation work.
Instructions
Step 1
Determine what types are required for construction activities in your firm. In turn, construction licenses can be of the following types: for survey work, for design, for installation work, for the construction of structures and for engineering services. In order to obtain permission to install meters, you need a building license to carry out installation work.
Step 2
Pass the mandatory expert on-site audit of your company. Then go through the commission in the architectural building inspection and write an application for obtaining the necessary license in the territorial division of the inspection.
Step 3
Prepare the necessary documents for obtaining a building license from the State Architectural Building Inspectorate. Attach to the application all the necessary certificates, permits and passports for equipment, extracts from the balance sheet, staffing table, copies of work books and employee diplomas. All documents must be notarized. In turn, the technique can be used not only its own, but also rented, corresponding in all technical parameters that are declared for the type of work. Therefore, for all the available equipment, a technical passport, as well as checks from an occupational safety institution, must be available.
Step 4
Please note that your company must have regulatory and technical literature, confirmed by contracts, invoices or acceptance certificates.
Step 5
Submit the collected package of documents to the state expert center. After that, wait for the representative to leave the given institution to your organization. He will check the accuracy of all the documents you have provided and then make an expert opinion.
Step 6
Submit a complete package of documents, along with an expert opinion. for consideration of an application for obtaining a license by a preliminary commission to the territorial office of the architectural construction inspection.
Step 7
Submit all documents with the decisions of the territorial division of the architectural building inspection and defend yourself before the commission in the Main Department of the Architectural Building Inspection. Then wait for a response. At the same time, remember that this application is considered not one or two days, but about a month.