How To Place A Billboard

Table of contents:

How To Place A Billboard
How To Place A Billboard

Video: How To Place A Billboard

Video: How To Place A Billboard
Video: Place Artwork on a Billboard (Create Your Own Mockup) | Photoshop 2024, November
Anonim

There are dozens of ways to convey information to consumers in the advertising market - television, radio, streamers, etc. Of course, opening your own channel is quite costly, but there are also less wasteful options. Billboards, or billboards, bring a good income to the owners, but in order to install it, a number of permits from the controlling structures are required.

How to place a billboard
How to place a billboard

Instructions

Step 1

When choosing a place to install metal structures, you should study the building codes and rules for installing billboards. In them you will find a lot of useful information, in particular: places where the installation of billboards is prohibited, the required number of meters from various road signs, the road itself, etc.

Step 2

After the location of the future installation is determined, a diagram should be drawn on a topographic map indicating the exact location. It can be found on the Internet on resources such as Google or Yandex maps.

Step 3

In the department of registration and distribution of land plots, write a statement addressed to the manager, you will find a sample on the information stand or from the secretary. This paper must be written in two copies - one will remain with you, the second is submitted and registered with a state institution.

Step 4

Documents are checked within 30 days. If all the papers are drawn up in accordance with the requirements presented, an open auction is appointed. The announcement of the date of its holding is published in the bulletins of the municipality. According to the law, everyone can take part in it.

Step 5

If you become the winner of the auction, the service specialists will require additional documents, namely: charter papers of the company for which the place will be registered, a receipt for payment of tax at the place of installation of the structure.

Step 6

It takes about two months to design a place for an advertising structure. After you have received permission to install, you can start installing. The place that you have chosen is retained for one year, after which the procedure must be repeated again.

Recommended: